Even the most precise project design only takes effect once it is translated into the tender flawlessly and unambiguously. A complete specification eliminates room for interpretation among contractors and ensures the exact architectural and qualitative execution of the design.
During the tender phase, we transfer the design principles we have developed into a legally sound, detailed bill of quantities. We structure and quantify all partial works for your klinker facade. The result is a solid, transparent basis for awarding the contract that ensures maximum comparability and forms the basis for an optimal award outcome.
Our range of services for the tender
Based on the results of the project design, we prepare the detailed tender documents for your building envelope:
Tender drawings and preliminary quantities: Precise drawings and exact, traceable quantity take-offs as a binding basis for costing.
Standard-compliant bills of quantities: Structured preparation of the bill of quantities per Swiss CRB standards (NPK 113 for scaffolding, NPK 314 for monolithic concrete and masonry facades, and NPK 315 for rear-ventilated curtain wall facade systems).
Complete definition of works: Clear description of all construction details, material qualities, joints and special components, to proactively prevent variation orders during construction.
Integral added value in the tender phase
Professional bill-of-quantities preparation secures the interface between planning and physical execution on site.
Added value for architects
Precise design control: Ensures that all design details and material specifications (such as textures, joint patterns or surface finishes) are captured in the bill of quantities without loss of quality.
Enormous time savings: Relieves your team of time-consuming quantity take-offs and the complex, specialist costing of klinker and concrete structures.
Smooth tender phase: No time-consuming queries or ambiguities from bidding contractors, thanks to technically flawless documents.
Added value for clients
Maximum cost transparency: Fully comparable bids (comparing like with like) give you the true market value of the works, without hidden risks.
Minimised risk of variation orders: Unforeseen additional costs are eliminated in advance through complete, cross-trade clarification of interfaces.
Reliable contracting partners: Clear contractual and technical foundations lead to a collaborative, professional process during execution.
We are happy to support you in precisely formulating your tender. Whether characterful klinker facades or demanding concrete structures — we ensure your project is positioned optimally in the market, both economically and technically.
Request a Quote Now
Give us the contract and we will support your project from element planning through to the finished exposed facade.